Given what has been happening in Seymour Road, Elsternwick with the destruction of two period homes, and council’s failure to have up to date heritage overlays, we thought it worthwhile to revisit a post we made in October 2018.

The significance of the ‘action plan’ of 2018, is that council has watered down most of the promises given to residents in 2016 at the time of the Planning Scheme Review. We repeat what we wrote at the time and urge residents to note how much of what was promised no longer exists in its entirety, or has morphed into meaningless, discretionary controls only. More to the point, most of these promises have now been pushed back years and years. Heritage is the perfect case in point.

We have created a table below which features the promises from 2016 and put them alongside what is the plan today. One major difference between 2016 and 2018 that should be highlighted is the disappearance of any intention to introduce a Neighbourhood Character Policy. In 2016 we got these statements:

A Neighbourhood Character Policy is recommended to clarify when protection of existing character is required, and clarity on neighbourhood character design outcomes for ‘change areas’

AND

The work plan also recommends that the residential zones support the neighbourhood character policy by including additional neighbourhood character objectives and increased schedule standards to protect and enhance character.

In 2018, this has gone and with no explanation, justification, or further reference, is replaced with this single sentence – The implementation of the Quality Design Guidelines addresses the Planning Scheme Review 2016 Work Plan action to implement a Neighbourhood Character Policy

There are several things to note about these proposed changes:

  • The Quality Design Guidelines only apply to the existing structure plans of Bentleigh, Elsternwick and Carnegie. They are not mandatory.
  • Its status in the Planning Scheme is nothing more than a ‘reference document’ and hence is basically useless. At least a full blown POLICY, whilst also not mandatory, would at least have more weight at VCAT than an appended ‘reference’ document.
  • The 2016 statements applied to ALL housing diversity, not just the 3 Activity Centres of Bentleigh, Carnegie & Elsternwick.  Yet even in these latter activity centres nothing has changed in terms of the schedules for permeability, site coverage, open space, etc.

There is much, much more which has been tossed out in the 2018 version -ie

  • The major heritage ‘review’ is now set down for the Major Activity Centres with no time line as to when the entire municipality review will be completed.
  • Tree registers and open space amendments are years down the track
  • And poor old neighbourhood/local centres such as Ormond, McKinnon, East Bentleigh, etc.will not have any protection for years and years. Council is only committing to ‘one or two’ urban design frameworks starting in 2021/22!!!! PLUS no longer any talk of ‘structure plans’ for these centres just Urban Design Frameworks!!!!.
  • Limiting the impact of car parking basements is also watered down so instead of definitive standards such as Bayside implemented years ago in its schedules to the zones (ie max of 75% site coverage) our council is happy with statements such as this in its so called QUALITY Design Guidelines – Buildings should minimise basement footprints within the front and rear setbacks to provide for deep planting. No ‘musts’, no numbers, no changes to the schedules throughout the municipality.

Here is the table which quotes verbatim the August 2016 report and the current 2018 report. We have only highlighted some of the most important issues. The dates in parenthesis for 2018 merely indicate the STARTING TIME AND NOT COMPLETION TIME.

Please read carefully and consider the consequences.­­­

This is anything BUT a Planning Scheme Review. Yes we acknowledge that after 15 years of doing nothing Glen Eira Council is certainly behind the eight ball. But this should not be the excuse for watering down what was promised in 2016 without consultation and most importantly, without any strategic justification. It is merely another example of why this council cannot be trusted!